發(fā)布時間:2018-06-05發(fā)布者:點擊次數:1195
Jiaxing Weixin Electric Co., Ltd. EIA document publicity
Jiaxing Weixin Electric Co., Ltd. has an annual output of 380,000 sets (sets) of integrated ceiling production and construction sites located at the east side of Jing'er Road, Yuxin Town, and leases 10,397 square meters of all factories of Jiaxing Kangxin Electric Co., Ltd. The total investment of the project is 17.6 million yuan, including 12.6 million in fixed assets investment (including equipment purchase cost of 11.3 million yuan, installation project of 300,000 yuan, engineering construction cost of 500,000 yuan, and preparation cost of 500,000 yuan), and initial working capital of 5 million yuan.
The "Environmental Impact Assessment Document" shall be publicized prior to the approval of the "Jiaxing Weixin Electric Co., Ltd. Annual output of 380,000 (sets) integrated ceiling production and construction projects".
Number | Project Name | Construction Site | Construction Unit | Environmental Assessment Agency | Attachment Link |
1 | Jiaxing Weixin Electric Co., Ltd. Annually Produces 380,000 (sets) Integrated Ceiling Production and Construction Projects | Yuxin Town, East Second Road | Jiaxing Weixin Electric Co., Ltd. | Zhejiang Evergreen Environmental Sci & Tech Co., Ltd. | Jiaxing Weixin Electric Co., Ltd. Annual output of 380,000 (sets) integrated ceiling production and construction project environmental impact report form |
Publicity time: May 25, 2018 to June 07, 2018
Report View Contact Unit: Jiaxing Weixin Electric Co., Ltd.
Report View Contact: Wang YuefengTel: 13705731993
Address: East Side of Jinger Road, Yuxin Town
The public may consult the construction company about relevant information by letter, fax or other means, and put forward relevant opinions and suggestions.
嘉興威信電氣有限公司年產38萬件(套)集成吊頂生產建設項目環(huán)境影響報告表.pdf